湿法全鱼粉生产线工艺流程图
1.deal with 150t fish in daily (24 hours)produce 30t fishmeal the equipment (not include boiler room)need 87.7kw power
2. one workshop (Long 15 meters, wide 12meters) has a boiler room(4t)
3. producing half degreasing fishmeal use 2-3 sets consecutive dry machine
4. producing degreasing fishmeal use 2-3 sets consecutive dry machine